Work on Block 101 (the bow at the keel level) has finished in the shed, and it’s been painted ready for lifting.

To get it the Investigator Erection Area, it needed to be put up the right way, and this is how it was done.

Check out the photos taken by Brian Thompson, who is part of the CSIRO Site Team in Singapore.